Project "Low-cost Houses"

Task: Construction of at least 5000 houses elsewhere in Aangola in a short construction period
Objective: To keep the production costs per house very low while still maintaining very good quality
Solution: The low-cost houses system. 3D Construction System from Austria
 System Process

1. Construction of a manufactoring works in Angola fpr producing 3D panels.
2. Founding a construction company for assembly and completion of houses which are delivered to the works in a prefabricated state.
3. Construction of a concrete mixing plant for the production of concrete necessary for the floor plates, ceilings and walls.
4. Construction of a quarry with mobile crushing and screening technology for the production of raw materials for concrete production as well as gravel and chippings. 
|